A quote (quotation) is a fixed-price offer for a defined scope of work or goods, valid for a stated period: once the buyer accepts it, the price is set.
A quote, or quotation, is a document in which a seller offers to supply specific goods or do specific work for a fixed price, valid until a stated date. When the buyer accepts, the quote becomes the agreed price, and the seller cannot raise it unless the scope changes. “Quote” is the common American term; “quotation” means the same thing and is more usual in formal and international business.
The other everyday meaning of “quote”, repeating someone's words, has nothing to do with this page; in business, to quote a job is to put a price on it.
| Quote | Estimate | Bid | Proposal | |
|---|---|---|---|---|
| Price | Fixed for the stated scope | Approximate; may change | Fixed; competitive | Fixed, often with options |
| Binding when accepted | Yes | No (terms yes, price no) | Yes, per bid rules | Yes, for the option chosen |
| Typical validity | 14–30 days | 30 days | Set by the bid | 30 days |
| Use when | Scope is clear | Scope or conditions uncertain | Formal competitive work | Client needs the approach, not just the price |
A quote is an offer. It becomes a contract when the client accepts it within the validity period, by signing, by replying in writing, or by paying the deposit. From then on the price holds for the scope described. Anything outside the scope is a change order with its own price. That is why the exclusions on a quote matter as much as the inclusions: they define what the fixed price does not cover.
If the client accepts after the valid-until date, the seller may re-quote. If the seller makes a clear arithmetic error, most courts allow correction before acceptance, but not after the client has relied on it.
| Situation | What the quote looks like |
|---|---|
| Trade job (plumbing, painting) | Scope paragraph, lines per task and per material, exclusions, 30-day validity, 30% deposit |
| Product order (wholesale) | Items with SKU, quantity, unit price, delivery terms, validity tied to supplier pricing |
| Service package (photography, cleaning) | Package name, what is included, add-ons priced separately, date held on deposit |
| Freelance project | Deliverables, revision rounds, timeline, milestone payments, usage rights |
Avo keeps your clients and your usual line items, so the next invoice is three taps. Your first three documents are free, full-quality PDF, no watermark. Premium from $59.99/year if you invoice often.

Scan the code with your iPhone camera to open Avo in the App Store, or email yourself the link.
A fixed-price offer to supply goods or services as described, valid until a stated date. Accepted in time, it sets the price. It differs from an estimate, which is an approximation that can change.
Once accepted within its validity period, generally yes, for the scope it describes. Before acceptance it is an offer the seller can withdraw. The exclusions and the valid-until date define its limits.
A quote comes before the work and states the price offered; an invoice comes after and requests payment for what was done. A good invoice repeats the quote's lines so the client can see they match.
Only by agreement, usually through a change order for work outside the original scope. The accepted price for the original scope stays fixed.
Whatever the quote says: 14–30 days is standard. Shorter when material prices move fast. Without a date, courts may treat it as valid for a reasonable time, which is an argument you do not want.
No. “Quotation” is the formal word and the usual one outside the US; “quote” is standard American business usage. Either works as the document title.