Moving Estimate Template (Free Fillable PDF)
A moving estimate the client can say yes to: scope in plain words, every line priced, a valid-until date and a deposit rule, all on one page. Same layout as the invoice, so nothing is retyped when the job is approved.
Free, fillable, US Letter. No email, no sign-up.
ESTIMATEMoving estimate template
avoinvoice.com
From
Your business name
Address
Phone · email
Bill to
Client name
Client address
Phone · email
Origin → destination, date
USDOT / MC # or state lic.
| Description | Qty × rate | Amount |
|---|
| Labor: crew size, start–end times (hours × rate) | | |
| Travel time / trip fee | | |
| Long distance: weight (lb) × rate, from scale ticket | | |
| Packing labor (hours × rate) / materials (count × price) | | |
| Extras: stairs, long carry, shuttle, piano, bulky items | | |
| Valuation coverage option / deposit (negative) | | |
| | | |
| | | |
SubtotalTaxEstimated total
Balance due on delivery, before unloading, by card, cash or certified check; deposit credited above. Charges are per the estimate and the tariff on file; on interstate moves the amount due at delivery may not exceed the binding estimate or 110% of a non-binding estimate. Released-value protection (60¢ per pound per article) applies unless full-value protection was selected above.
What the PDF looks like. Hints in the line table show what a mover usually prices; type over them.
What to include on a moving estimate
- Your business name, license and contactThe same header as your invoice, so the two documents match.
- Client and job addressWhere the work will happen.
- Estimate number and date, valid-until date30 days is standard; the date stops old estimates being accepted later.
- Scope in plain wordsWhat is included and, just as important, what is not.
- Line items with quantitiesThe lines a mover typically bills: labor: crew size, start–end times, travel time / trip fee, long distance: weight, packing labor.
- Allowances and exclusionsMaterials chosen by the client, permits, disposal: say whether they are in or out.
- Deposit and payment scheduleDeposit on acceptance, balance on completion, or progress payments for longer jobs.
- Acceptance lineName, signature, date. A signed estimate is your approval record.
Example moving estimate
The same lines the job will be invoiced for, without the deposit or credits. Keep quantities visible so the client sees what changes if the scope changes.
| Description | Qty × rate | Amount |
|---|
| Local move, 3-person crew, 8:00 am–2:30 pm (30 min break) | 6 h × $165.00 | $990.00 |
| Travel time, shop to origin and destination to shop | 1 h × $165.00 | $165.00 |
| Packing materials: 24 medium boxes, 6 wardrobe boxes, paper and tape | 1 lot | $214.00 |
| Stair carry, 3rd floor walk-up at destination | 1 | $120.00 |
| Total due | $1,489.00 |
How to use the template
- Download the PDFFillable form, opens in any PDF reader on a computer or phone.
- Fill in your details onceHeader, terms and deposit rule. Save it as your master copy.
- Add the job and sendLines, quantities, valid-until date. Export and send; when the client says yes, turn it into the invoice.
Fill it on your iPhone in a minute instead
Avo keeps your clients and your usual line items, so the next invoice is three taps. Your first three documents are free, full-quality PDF, no watermark. Premium from $59.99/year if you invoice often.


On your computer? Send Avo to your iPhoneScan the code with your iPhone camera to open Avo in the App Store, or email yourself the link.
Questions
What is the difference between an estimate and a quote?
An estimate is an educated approximation that can change when the scope changes; a quote is a fixed price the client accepts. Call the document an Estimate unless you are prepared to hold the number. Both should have an expiry date.
How long should an estimate be valid?
30 days is standard for trades; 14 days if material prices move quickly. Put the date on the document so an old estimate cannot be accepted months later.
Should I ask for a deposit on an estimate?
Yes for new clients and for jobs with materials: state the deposit on the estimate (commonly 25-50%) so it is agreed before work starts, then show it as a credit on the invoice.
Can I turn this estimate into an invoice?
Yes. Keep the line items, change the title, remove the expiry line, add the invoice number and due date, and subtract any deposit received. An app that does this in one tap saves retyping every job.
Does this estimate template work for moving jobs of any size?
Yes. For small jobs use three or four lines; for larger ones add a scope paragraph in the notes and bill by milestone. The matching moving invoice template uses the same layout.
Invoice for the same trade
Estimate templates for related trades